Priority based power sharing in parallel connected boost converters is one of the simplest power sharing scheme to run the boost converters in parallel operation. in this simulation it is considered that the boost converters are physically not far from each other, and the controllers of the converters can communicate with other. One of the converters will run on higher priority which means that that converter will supply as much power as it can to the bus, and another will only supply additional power required to maintain bus stability i.e: maintain the bus voltage. Following figure shows the hardware setup of the experiment. Figure: Boost converter parallel operation experimental setup this configuration of the converter is applicable in the conditions where we need to draw as much power from a source as possible and draw only additional power required to maintain bus voltage from the secondary source. An example application case would be when there is a solar and battery-based hom...